Locations for notching and drilling in timber frame construction are very limited and restricted. In special circumstances other areas may be drilled and notched but this must be determined at the design stage and must be completed by the timber frame manufacturer or by trained installer under the instruction/approval of the timber frame manufacturer.
Select the link above to copy to your clipboard.
Construction Guides Terms of Service
Building Regulations and Other Guidance
Part A Structure
Part B Fire Safety Volume 1 all other types of buildings excluding dwelling houses.
Part B Fire Safety Volume 2 dwelling houses
Part C Site Preparation and Resistance to Moisture
Part D Materials and Workmanship
Part E Sound
Part F Ventilation
Part G Hygiene
Part H Drainage
Part J Heat Producing Appliances
Part K Stairways, Ladders, Ramps and Guards
Part M Access and Use Dwellings
Part L Energy Conservation
Timber Frame Construction
Building Energy Ratings
Energy Efficiency & Renewable Energy Systems
Air Leakage
Acceptable Construction Details
Irish Water Requirements for Dwellings
Radon
Typical Inspection Reports