Show Filters
FAQs

How frequently are inspections required?

Share

The frequency of inspection will be determined by the Inspection Plan.

The Inspection Plan will be judged by the appropriate intensity and frequency of inspections as per the nature of the building project. The following must be considered:

  • Type of building, type of construction and expertise of the Builder.

  • How complicated or relatively straight forward the method of construction is.

  • Whether recent experience indicates current problems in interpreting and/or achieving compliance with certain requirements.

  • How serious the consequences of a particular contravention might be.

  • The impracticability or impossibility of subsequent inspection of closed up work.

  • The speed of construction, or methods of fast track construction.

IS 440 Time and temperature Tongue and groove Building energy rating